Alaska signs off on a $350 million hybrid diesel-electric ferry to replace a 62-year-old boatDiesel-electric hybrid, level to be confirmed

Louisiana shipbuilder Thoma-Sea has been confirmed to build Alaska's replacement for the 62-year-old ferry Tustumena: a $350 million hybrid diesel-electric vessel, WorkBoat reported on 9 November. Alaska's Department of Transportation and Public Facilities has been pursuing a diesel-electric hybrid design for the route since issuing its propulsion-system RFP back in 2022. The new ferry is expected to carry around 250 passengers and up to 58 vehicles. Neither WorkBoat's report nor Alaska DOT&PF's own materials give a battery kWh figure or spell out whether the hybrid architecture is series or parallel, so this is a confirmed diesel-electric hybrid commitment without a firm MHEV/HEV/PHEV level attached yet, worth chasing once the spec sheet lands.
Primary source: WorkBoat, 9 November 2026, corroborated by Alaska DOT&PF's own 2026 low-bidder announcement.