Weekly email edition coming soon

Diesel Industry News

PHILIPPINES
Philippine diesel news, verified.
Proudly brought to you by Berrima Diesel Service, The Family of Diesel Experts since 1956
PH3 ยท Farm and Industry

DOE warns of possible red alerts across all three grids in 2027, chases 293 MW of power barges

DOE briefing reported by Power Philippines and Philstar, 9 to 10 November 2026
PROJECTION DOE's red-alert count and the 293 MW power-barge figure are projections and expressions of interest, not a finalised plan.

Philippine Energy Secretary Sharon Garin told a briefing on 9 November that DOE projections point to about seven possible red-alert events across the national grids in 2027: four in the Visayas, two in Mindanao and one in Luzon. The department expects a very strong El Nino to bite next year, and the risk holds even after accounting for 253 MW of new battery storage coming online.

DOE Director Luningning Baltazar said, as reported by Power Philippines, that the department has received expressions of interest for 293 MW of power barges for 2027, mostly destined for the Visayas grid. That figure is expressions of interest only; nothing has been contracted yet, and no fuel type has been specified for the proposed barges themselves.

Garin said barges typically take about three months to arrive once contracted, and that the DOE is in talks with owners of barges and with owners of standby diesel and coal plants for backup generation. She said hydro output could fall by 60% or more under the El Nino scenario, and that she is "not that confident" blackouts can be avoided.

Why it matters: More standby and barge-mounted backup generation ahead of 2027 means more demand for diesel gensets, fuel supply and maintenance work through the dry season, particularly in the Visayas and Mindanao.
Filed by the Diesel Industry News Philippines desk.