Stellantis's diesel-hybrid van engine gets firmer detail: a 2.2 litre Multijet with 48V assist, built from 2029
Why it matters: this is the first fresh, on-record diesel-hybrid development we've had after a dry spell of more than four weeks, and it's now tied to a named plant and Stellantis's roughly 1 billion euro investment at Atessa.
Reuters reported on 15 October that Stellantis is testing a new diesel-hybrid powertrain for its large European vans, the Fiat Ducato, Peugeot Boxer and Citroen Jumper, built at the Atessa plant in Italy. A Stellantis spokesperson confirmed to Reuters the powertrain is "still in a testing phase, with no timeframe yet established for its market launch." The Italian metalworkers' union FISMIC has since gone further, announcing a 2.2-litre Multijet diesel paired with 48V mild-hybrid assistance, to be built at Stellantis's Pratola Serra plant near Avellino from 2029, powering Ducato-platform vehicles assembled at Atessa and at Gliwice in Poland. That detail is corroborated independently by two Italian industry outlets, hdmotori.it and marklines.com, but it is still union and trade-press sourced, not a direct Stellantis company statement. A date discrepancy remains unresolved: one Italian outlet, Motori Magazine, separately cites 2028 as the target for the new Ducato itself, against the 2029 figure for engine production. Stellantis has confirmed neither date.
Primary source: Reuters via Capital.com, 15 October 2026; Il Sole 24 Ore, 15 October 2026; FISMIC union detail via hdmotori.it and marklines.com, 29 and 30 September 2026. Hybrid level: MHEV, 2.2 litre Multijet diesel plus 48V, per union and trade-press sources, not yet confirmed directly by Stellantis. No safe image available this cycle, we're running this one text only rather than use an unrelated stock Ducato shot.